The front entrance and sidewalks at Cleveland’s Rock & Roll Hall of Fame were the site of a concrete replacement project for ALBA Contractors, Inc. We removed the existing concrete and poured new concrete in its place, with our tear-out, prep, and pour crews involved as the work progressed.
Concrete Work Around the Museum Entrance
The Rock Hall welcomed about half a million visitors in 2023, according to its annual report. Outside the museum’s glass-fronted building is a broad paved entrance area. We worked there and on the sidewalks, which extended the project beyond the space immediately outside the doors.
In another part of the work zone, our crew handled material at a paved edge alongside landscaped grass. That setting was different from the open paving at the main entrance, even though both were within the project’s outdoor work areas.
The museum also serves people with different mobility needs, so ADA requirements are relevant to its pedestrian areas. The U.S. Access Board’s guidance on accessible routes explains how routes connect public sidewalks and other arrival points to accessible building entrances. At a property like the Rock Hall, both the sidewalks and entrance areas matter to that larger picture of visitor access.
Removing the Old Concrete and Pouring the Replacement
Our tear-out crew worked on removing the existing concrete. In one section, a worker used a handheld demolition tool to break up pavement, with broken pieces spread across the work area. A skid-steer loader and tracked excavator were present near the museum entrance. Cones and temporary barriers marked off parts of the construction area.
Our prep and pour crews also took part as the job progressed. Those crews handled preparation and placement of the replacement concrete, with different workers involved at different stages.
The Federal Highway Administration’s guide to pedestrian facilities distinguishes removal and replacement of sidewalk sections from smaller repairs such as grinding the surface. Our work at the Rock Hall involved taking out existing concrete and placing new concrete, not just treating the surface of the old pavement.
About Two Weeks From Start to Finish
Approximately five to ten workers were on-site each day during the project. From the first work through completion, the project took around two weeks. The customer was thrilled with the outcome and excited for everyone coming to the Rock & Roll Hall of Fame to use the finished entrance and sidewalk areas.
Need Concrete Work at Your Commercial Property?
If you need concrete removed and replaced at a commercial entrance, sidewalk, or walkway, our team handles this type of work. Contact us to request a quote and tell us about your property and the concrete work you’re planning.