Replacing concrete sidewalk blocks at Cleveland Public Library’s downtown entrance meant working beside a busy city street.
ALBA Contractors, Inc. removed and replaced a stretch of the entrance sidewalk as part of our work for the library system. We have been contracted for several library projects, but downtown traffic presented a particular challenge here: keeping our crews and equipment from becoming a major inconvenience to the public.
Removing and Replacing the Entrance Sidewalk
The assignment involved complete removal and replacement of the selected sidewalk blocks. We had approximately five to ten workers on site each day.
As the project progressed, our tear-out crew removed the existing concrete, our prep crew prepared the area, and our pour crew placed the replacement concrete. The entrance job took around three or four days from start to finish.
An excavator was positioned beside the disturbed sidewalk section near the surrounding fence and pedestrian space. The work took place alongside the pedestrian space at the building entrance, rather than away from the public in a separate construction area.
The Federal Highway Administration’s sidewalk maintenance guidance distinguishes replacement of entire sidewalk sections from smaller repairs that treat isolated surface problems. The scope at this entrance was the removal and replacement of a stretch of blocks, rather than a repair to a small part of the existing concrete surface.
Working Around Downtown Traffic and a Sidewalk Closure
Downtown traffic was the main challenge on this project. Our trucks and other equipment were positioned along the street near the sidewalk work area.
We worked around heavier traffic periods to limit how much our activity would inconvenience people in the area. Coordinating the work around those busier periods was one part of managing a jobsite alongside an active road.
We also prioritized signage for people who might be affected by the sidewalk work.
Orange cones marked the work area, and a SIDEWALK CLOSED sign stood in front of the affected section. It gave people approaching the entrance a visible notice that this part of the walkway was closed.
The U.S. Access Board’s public-right-of-way guidance addresses signs and pedestrian access when construction interrupts a walkway. At the library, the closure signage addressed people on foot, while adjusting our work around heavy traffic addressed activity along the street. Both were part of our response to the downtown setting.
A Completed Entrance Project Followed by More Library Work
The library customer was extremely happy with the finished sidewalk replacement. After that job, Cleveland Public Library hired us for additional projects at other branches.
Our broader work for the library system includes concrete repair and maintenance at several branches. The completed downtown entrance replacement was one project within that larger library relationship.
Talk with ALBA About Your Concrete Sidewalk Project
If you manage a commercial property or public facility that needs concrete sidewalk replacement or other concrete flatwork, contact our team about the work you have in mind. Request a quote from us to get started.